Understanding that Table R602.3(1) item 8 details how to fasten studs to eachother, as an inspector I cannot verify they were connected correctly. In order to 'show' they are fastened, most of my contractors strap them together using Simpson CS16 straps across at an angle. Simpson does not have any guidance regarding this specific application using CS16, but if it is angled right, the holes will align up in such a way to fit perfectly in the middle of any 2x stud vertically. Does anyone know where this is written?