Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
That is a good point, but do you think it's relevant?Looks like it will be blocked by the tv mount, it should be closer to one of the corners.
For code? Probably not. For thinking forward to actual use? Yes.That is a good point, but do you think it's relevant?
How do you change the receptacle? Do you remove a built-in cabinet that requires a pry-bar?Looks like it complies with NEC 314.29.
Cheers, Wayne
https://images.thdstatic.com/produc...vn/ryobi-oscillating-tools-pcl430b-64_100.jpgHow do you change the receptacle? Do you remove a built-in cabinet that requires a pry-bar?
The hole in the back of the cabinet provides the necessary access. Looks large enough, and it has little or no overlap with the footprint of the faceplate. So what's the problem?How do you change the receptacle? Do you remove a built-in cabinet that requires a pry-bar?
Fly to Palm Beach next week, and I will give you tools, and you can see how far you get. If you can do it without cutting out a larger hole, or damaging anything and replace the receptacle, I will reimburse you for your flight.The hole in the back of the cabinet provides the necessary access. Looks large enough, and it has little or no overlap with the footprint of the faceplate. So what's the problem?
Cheers, Wayne
Absolutely not bluffing, but will only pay for a seat in coach. The CO is not issued yet, and I have a good relationship with the builder for access. Time to put hands where typing fingers are. (formerly known as 'put your money where your mouth is.")He's bluffing Wayne.
Would be faster for you to tell me the hole diameter (looks to be 6"?), and the perpendicular to wall offset between the drywall and the face of the back of the cabinet (looks to be 1-1/2"?), and for me to build a mockup here, video myself doing the receptacle replacement, and post that.Fly to Palm Beach next week . . .
Then your concerns should be satisfied if you ask for a larger hole, e.g. 8". But that request is not justified by the NEC.The CO is not issued yet, and I have a good relationship with the builder for access.
I am currently out of town attending a funeral and viewing today and tomorrow and I will not return back to work in Florida until Monday. On Monday morning, I will go and get all of the measurements and take photos for your mock up.Would be faster for you to tell me the hole diameter (looks to be 6"?), and the perpendicular to wall offset between the drywall and the face of the back of the cabinet (looks to be 1-1/2"?), and for me to build a mockup here, video myself doing the receptacle replacement, and post that.
However, I'm not going to do any of that, as it is obviously feasible. Best case there's enough wire inside the box that the receptacle can be pulled through the hole to access the side screws. Worst case for the new receptacle you can preinstall pigtails on the screws and connect to the existing wiring with Wago Lever-Nuts.
Then your concerns should be satisfied if you ask for a larger hole, e.g. 8". But that request is not justified by the NEC.
Cheers, Wayne
Wayne's gonna want a snack on that coach flight and I bet some of those little bottles?Absolutely not bluffing, but will only pay for a seat in coach.