Alias
REGISTERED
I red tagged this pole last Friday. A permit application arrived at 1:55 PM the week before without any site plan or information about the installation. This is for a commercial project and I informed the owner that I needed a site plan. I asked him who his contractor was and he told me that 'his man' had already installed the temp power and pole. :banghdThis is what I found when I went to tag the pole:View attachment 1197View attachment 1196View attachment 1195
View attachment 1642
View attachment 1643
View attachment 1644
View attachment 1642
View attachment 1643
View attachment 1644
/monthly_2012_01/572953e48f2b6_Baird-Mall-USFS-5thwheelamptemppower004.jpg.79f68b2f9ba78c34789f1836b4f11188.jpg
/monthly_2012_01/572953e49153f_Baird-Mall-USFS-5thwheelamptemppower006.jpg.d10bccb799ea741f5bd5b84a41a3c2c3.jpg
/monthly_2012_01/572953e4946da_Baird-Mall-USFS-5thwheelamptemppower008.jpg.ee6b8392c73d9f1665a5b0e05e8741e6.jpg
View attachment 1642
View attachment 1643
View attachment 1644
View attachment 1642
View attachment 1643
View attachment 1644
/monthly_2012_01/572953e48f2b6_Baird-Mall-USFS-5thwheelamptemppower004.jpg.79f68b2f9ba78c34789f1836b4f11188.jpg
/monthly_2012_01/572953e49153f_Baird-Mall-USFS-5thwheelamptemppower006.jpg.d10bccb799ea741f5bd5b84a41a3c2c3.jpg
/monthly_2012_01/572953e4946da_Baird-Mall-USFS-5thwheelamptemppower008.jpg.ee6b8392c73d9f1665a5b0e05e8741e6.jpg