Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
But if they fill the hole with concrete, they might be good...If the fittings are identified for the use...362.12 ENT not for direct earth burial.
They added a pin piling there for a reason. That has to be all concrete and there will be a pre-pour inspection.I bet they fill the hole with dirt up to the conduit, and pour concrete over that. Technically the flex is then not completely encased in concrete ... the bottom is against dirt.
The existing conduit is PVC, not ENTIt appears that the existing conduit, near the shoes, is in contact with the earth.