Oh my....The house is vacant. The new owner was there for inspection of a PV system and an electrical service upgrade. The water heater has corrections and no permit. I had to tell her to not use it.. She wanted me to explain why the real estate "home" inspector didn't mention the water heater deficiencies.
View attachment 3772
Yes it is the same furnace...and I must say that I am surprised that you remembered the first picture. People can do some amazing things.Those Safe-T-Switches and blue wire nut look familiar. Is that the same furnace from post #3037?
They may be required per 802.3.1 given certain methods of traditional stick framing. Also see Figure R802.5.1.Straps across a ridge are not unusual.
The tiles were removed on the plane of roof that has PV. Rolled roofing has been applied. The pv has been installed and the tiles around the perimeter have been placed. There’s no tiles under the array. This is a common approach to mounting PV.
What's the purpose of the strap across the ridge? It would be nice if
Well I reckon that strap keeps the rafters held against the ridge board. Maybe it gives the roof diaphragm a bit more omf. I really don't know exactly. The roof covering will be tile so they won't show through and the usual strap is an ST 24 which is smaller than an MST48.Whats the purpose of the strap across the ridge? It would be nice if the nails were oroperly set before installing the shingles.
Well I reckon that strap keeps the rafters held against the ridge board. Maybe it gives the roof diaphragm a bit more omf. I really don't know exactly. The roof covering will be tile so they won't show through and the usual strap is an ST 24 which is smaller than an MST48.
The building is small.....hardly big enough to have bothered...it’s not more than eight feet wide with a strong wall at the gable end. So that MST strap almost seemed okay.
Mighty small or is it small but mighty. It’s a two bed, two bath ADU. The main house is seven bedrooms with six bathrooms. This is in a 70s tract of 2000 sq ft homes. The owner can’t understand why the neighbors are upset.
They may be required per 802.3.1 given certain methods of traditional stick framing. Also see Figure R802.5.1.