Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
Rated wall, the other side is a stairwell, part of an 4 story exit, 2 residential apartments being joined and renovated. View attachment 15149
Stretch it out 3 feet and call it a landing.....The stairs were new, and the sidewalk they land on is new.
The handrail doesn't exactly meet FHA, but the building is old enough that FHA does not apply.
All risers are 7", bottom rise is 5"
View attachment 15180
Metric. Metric makes it easier, it really freaking does.BN,
Your pic is a good example of trying to enforce the code in the field, it appears that the contractor tried to meet the code but the rise should have been calculated at a different height to make all the steps the same rise.
There are apps that will do the math for you if that's any help to DYI's or contractors.
As inspectors, we're still fighting with stair riser materials, proper handrail design and height as well as the riser issue in the pic.
That'll be interesting...Guy that ran the Blue NM used to string guitars...Staggered stud fire separation wall between two dwelling units, R-2 occupancy.
View attachment 15221
Were they thinking of bulkheading that, maybe?Staggered stud fire separation wall between two dwelling units, R-2 occupancy.
View attachment 15221
Are we seeing the same picture? I don’t see a cross piece at the panels.
Bulkheading, is that a cross piece above and below the panel?
Bulkheading, is that a cross piece above and below the panel?
Run f/r drywall behind the panel, so that the panel can be inset into the wall, but there's still a fire-resistant assembly between it and the rest of the wall.
If I could, I'd show a picture. Had a sparky do a *brilliant* job of creating a little inset into f/r drywall in an exit in order to recess an alarm panel. It retained the integrity of the fire separation with only the alarm wires (firestopped!) penetrating the exit shaft.IG,
Thanks for that clarification, I'm probably the only one here that didn't know that term, Bulkheading!
What the ... heck ... is a valve doing on a sprinkler feed? And that clearance can't be NFPA13 compliant.This is ICE worthy...Somebody's hand is going to be cramped writing violations...
It's a house with a head off the domestic...What the ... heck ... is a valve doing on a sprinkler feed? And that clearance can't be NFPA13 compliant.