JBI
REGISTERED
Re: Building Designer plans - Is an RDP stamp required?
Kil - Where is it you live? Geico City? :lol:
Kil - Where is it you live? Geico City? :lol:
Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
Yes, but I don't always have to follow prescriptive path. We do remember that single family residences are exempt under both the architectural (ORS 671) and engineering (ORS 672) laws when it comes to making plans and specifications for. Structural calculation is part of making plans and specification. Performing structural calculations IS the heart of "structural engineering". In performing any such calculations implies applying the knowledge of the mathematical, physical and engineering sciences in determining specifications. So to design an ICF wall system for houses or a trussed roof system or a lamella or another type of space frame roof system for S.F.R.s that is not prescriptive is to apply the knowledge of the mathematical, physical and engineering sciences to make plans and specifications for such systems for s.f.r.s - to accepted standards.kilitact said:yes, oregon is nice; they give you Tables (602.3(5), 602.3.1 etc) to follow and all those easy to read pictures. even a caveman should be able to build it. :lol:
I have the stance that I can make plans and specification (and that includes making structural calculations as it is pertinent to exempt buildings. To the same extent that I may make plans under architect law. I'm not "practicing engineering" or "practicing architecture" as far as licensing boards are concern if my services is ONLY for exempt buildings and I don't advertise my services using the words "architecture" or "engineering".kilitact said:so your stands is that you can practice engineering as a business in Oregon. I thought you had an understanding of the laws after our last conversation. :roll:
I think the difference is in the way the building falls down after engineering has been done like this.What makes the difference is how one calls themselves and what buildings they provide their service to and how they advertise their services.
Of course, there is more to calculating the beam span then I shown above but for brevity sake, I didn't point out the load condition but we can easily take 40 lb. live load, 10 or 20 lb. dead load. I also didn't specify the o.c. spacing for the beams. Suppose we have the beams spaced 8' o.c.kilitact said:well; if you tried to submit engineering in this jurisdiction or most of the other jurisdiction in oregon we would tell you to get professional help. In astoria and where else they have allowed you to submit designs. the engineers commentary that you posted was clear.