mjesse
REGISTERED
File sentdrwiltse77 said:I know this is an old post, but I cannot seem to open this pdf. Can you e-mail it to me at ...
mj
Last edited by a moderator:
Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
File sentdrwiltse77 said:I know this is an old post, but I cannot seem to open this pdf. Can you e-mail it to me at ...
You aren't able to download it as you are not a sawhorse (paid member of the forum)rajeshvbv said:Can you please provide a pdf copy of the study guide? I cannot download it from the forum. So, are you saying that we only need to study chapters 6 through 17 of Bldg Dept admin book?
Answer: IFC 105.6.22 High piled storage, Operational permit required to use a building or a portion of a building for high piled storage exceeding 500 Sq Ft.Coder said::Went from a lot of human resource questions to how much square feet is allowed before high piled combustible storage requires an operational permit?:![]()
Welcome.....rajeshvbv said:Can you please provide a pdf copy of the study guide? I cannot download it from the forum. So, are you saying that we only need to study chapters 6 through 17 of Bldg Dept admin book?
I'd like to get my hands on the study guide. If anyone could e-mail a copy, it would be much appreciated. m.a.caesar@gmail.com Thanks!
I'm a carpenter by trade. Spent some years on the management side of industrial construction/development and a few more in residential remodel/construction.