jwilly3879
Sawhorse
So how many sq feet is the lower level
2720 sf as yet undefined usage. Part will be for use of the food pantry, utility room and two bathrooms. It is a wood frame building.
So how many sq feet is the lower level
2720 sf as yet undefined usage. Part will be for use of the food pantry, utility room and two bathrooms. It is a wood frame building.
Yes, it is one story with a walk out basement.
Yes, it is one story with a walk out basement.
Yes, it is one story with a walk out basement.
Wood frame (type V), basement is not a story and the shell is up. The CEO (me) has held things up over the sprinkler issue and the Town Supervisor is very unhappy. When the original design for the building was enlarged by the supervisor I informed the Town Board that the building required sprinklers because of the increased occupant load. Now the supervisor is making me out to be against the project. His contention was the engineer who stamped the plans made no mention of sprinklers.
Don't miss the sprinkler requirements potentially driven by the basement....903.2.11.1ish...
Good Discussion!
Stick to your guns jwilly. When in doubt call your regional technical services office for input/clarification.
For a County owned building the County Engineers can make whatever call they want, but for a Town owned project it is the Town's call.
The most aggravating part of all this is the Town (supervisor and board) were aware of all of this before they went ahead with the project. I also informed them that a hydrant test should have been done prior proceeding with the larger design but they seemed to ignore that so consequently the fire protection system became a much more expensive project.
This entire project has been of the "Ready, Shoot , Aim" mentality.
I have not doubt I will prevail but be quite unpopular with those looking for an early grand opening.