View attachment 3024
It will be Just Fine
Header attachment, bearing.....Does not meet the prescriptive provisions of the IRC.
We can start with the header termination relative to the framing cavity...
The prescriptive narrow panels require the header to continue to the last full height stud in order to lock the header to the framing cavity and add rigidity to the assembly.
Beyond that would need close up shots of the remaining details of construction to determine whatever else fails to meet prescriptive compliance.
An RDP will need to provide alternatives in accordance with accepted engineering practice (probably a bit more than a few hurricane clips and ceiling sheathing...)