mtlogcabin
SAWHORSE
Back in the early 90's the 6-mil poly went under the footings and came up the on the inside of the form board. The poly kept the sand in Fl from quickly pulling the moisture out of the concrete. We dealt with "Hot Weather" so retaining moisture in the concrete was a real concern on slabs