Coyotes were running down the street.
I think the plant will burn....especially if it dies and dries out. The stucco is ruined and bugs live in it.If you cover your house in ivy, will that make it less likely to burn? Maybe that is what they were going for in the "green building" above...
The job is in another inspector's area so I am not sure what the plan is. That inspector had requested a drainage plan prior to my inspection but they didn't produce one. The person in charge apparently lacks knowledge regarding construction practices and the plans show a flat lot.Does the wall perimeter get drain tile and gravel? Will it drain to daylight?
ICE- Is it common out there for contractors to reuse their form boards in the construction? Or to use 2x material as forms in general? I realize you very rarely ever show us any "good" work, but I just can't get around the idea of those forms. 'Round here the locals would get a great big good belly laugh at a guy who tried something like that.
Last time I rented forms I think they were ~$3.00/foot. Maybe your prices out there are a lot higher?
It's that way around here, I can't even think of the last time I saw 2x used for forms. Contractors if the rent forms or a few of the larger ones have their own. This applies to both residential work commercial work.ICE- Is it common out there for contractors to reuse their form boards in the construction? Or to use 2x material as forms in general? I realize you very rarely ever show us any "good" work, but I just can't get around the idea of those forms. 'Round here the locals would get a great big good belly laugh at a guy who tried something like that.
Last time I rented forms I think they were ~$3.00/foot. Maybe your prices out there are a lot higher?
The code requires a 2/0 wire bend to have a minimum 4" radius. Too many workers don't know that or they confuse radius with diameter.
This person went both ways.
I met this worker. When I told him what was required he exclaimed that Edison wont allow a big loop that reaches near the bottom. According to him Edison wants the space open in case they decide to feed underground and therefor the existing 2/0 wires would be in the way. No kidding.....that's exactly what he said.
I have been asked why this matters.....many times. I don't have a good answer so I made one up. Here goes: electricity is a phenomenon that takes place on an atomic scale. It is the movement of electrons.
So the electrons are moving along a straight wire, well actually it's the hole where an electron was that's moving along the wire but that's not important here. Now the electrons hit a curve in the road. When the copper conductor is bent too tight, the atoms of copper are compressed together on one side and stretched apart on the other side. The electrons...er holes... have to slow down....but they can't and that generates heat in the wire. Heat causes more turmoil in the atomic world and that causes more resistance.
As always, there are caveats. For example if all of the available free electrons are just one color....blue is a good example. All blue electrons is one way to overcome the compounding heat effect. Blue is not known as a cool color for nothing.