Atleast they won't have any trouble finding it when they need it!
The plans also indicate 4 rebar in the footing and the picture only shows 3The footing is 12" deep from the middle of the slab on one side and 0" deep on the other side. The re-bar is supported on the wrong bar.
The plans also indicate 4 rebar in the footing and the picture only shows 3
ICE,
On the "day tank anchorage" detail (CMU wall), do you ever inspect the keyway between the foundation and the wall? Having the keyway is more work for the contractor. With #5 @ 24" vert passing through the joint, the keyway is probably a waste of time. But, it is shown on the approved plans. Is the keyway dimensioned on a typical detail or note?
Wow, they used a screw designed to go through cement board and were surprised when it tore that soft vinyl the shreds? Who'd have thought?