i suspect that it’s an array with more than one row of panels, so flashing in the middle of the array that can’t be reached without removing the panels.Why can't you just shove a piece of shingle up in there with some "Oh Henry plastic roof cement?" and call it good.
Have to take all the modules off?
yes and yes#4232 photo. Is there a violation? Is the chicken wire going the correct way?
You talk too much.yes and yes
When an inspector doesn't know the terminology it is no surprise that the correction states that the T&P + the smitty panDoesn't it have to be seismic in Cali?...They say you are tough.....I wouldn't be too critical of the word tailpiece, plans for residential? or commercial job?
And the T&P drain pipe? 6" or less?Skipped right over the pan drain....LOL