This job is a service upgrade. The contractor called me this morning to ask when I would arrive at his inspection. I told him that I planned on being there between 9 and 11. That set him off.....he wanted as late as possible. I agreed to delay until pm. He wasn't there so what difference did it make. I like it when jerks are not there.
He got ahead of himself with the stucco. Gave it a little too much too and the door will not close.
Bulging is not good.

He got ahead of himself with the stucco. Gave it a little too much too and the door will not close.


Bulging is not good.


Last edited: